Loading…
Loading…
781 results • Recent activity
WBPHED/AE/JSSD/e-NIT-02/24-25 SL-8
Estimate for Internal electrification work at Sindhap Water testing laboratory, Darjeeling
Annual maintenance of pipeline and pipeline track from Ch. No.178 to Ch no. 299 and day to day upkeep of Dolay transit camp and V-notch chamber from Dhaula towards Lava for the period of 01.08.2023 to 31.07.2024. under NKWSMD, PHE Dte. Kalimpong. SL
Annual maintenance of pipeline and pipeline track from 85mts span steel bridge (Ch. No. 92 to Ch no.178 towards Lava for the period of 01.08.2023 to 31.07.2024. under NKWSMD, PHE Dte. Kalimpong. SL NO-4
Annual maintenance of pipeline and pipeline track from Dhaula intake to 85 metre span steel bridge (Ch No of 0-92) including the maintenance of Dhaula intake, Dhaula V-notch chamber for the period of 01.08.2023 to 31.07.2024. under NKWSMD, PHE Dte.
Annual maintenance of 300 mm dia.and 250 mm dia. CI/M.S parallel pipeline and pipeline track from (Ch. No.112-224) to Dhaula for the period of 01.08.2023 to 31.07.2024. Under NKWSMD, PHE Dte. Kalimpong. SL NO-2