Loading…
Loading…
105 results • Latest
Dedicated Pipe laying for improvement of functionality for improvement of FHTC functionality by different dia. UPVC pipe,DI pipe and FHTC and Road crossing and augumentation of boundary wall for ALTOR Water Supply Scheme at Gazole Block of Malda Dis
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe,Providing Functional Household Tap Connection (FHTC) , Boundary wall,Aproach Raod at HW and 2nd TW site in for JIGIN piped Water Supply Scheme of Gazole
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 2 (Two) nos 25 m3 hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at KADIRPUR Water Supply Schem
Design, Fabrication, Supplying, Installing, Commissioning and 3 (three) months Trial Run of 45 m3hr. capacity of Iron Elimination Plant (Pressure Type) with provision of polishing unit and Construction of 3.60 mtr. X 3.00 mtr. Blower room of Head Wo
Laying of Dedicated pipe line for improvement of functionality and Design, Supplying. Fabrication, Erection Commissioning including 3 (three) months Trial Run of 135m3 hr. capacity Pressure type IRON ELIMINATION Plant with backwash water disp
Laying of Parallel/ Dedicated Pipeline for better Functionality at Durgapur Gobindapur Area of JOTGOPALPiped Water Supply Scheme at Englishbazar Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.