Loading…
Loading…
560 results • Recent activity
Sinking Tube well, Inter connection beteween TW Existing Pipe line, Boundary wall, Laying of Paraller/ dedicated Pipeline, Balance FHTC, Augmentation work of Pump House and Boundary Wall of Kandaran Zone-II Piped Water Supply Scheme at Cahnachal-
Construction of Pump house Boundary wall. Design, Supplying. Fabrication, Erection Commissioning including 3 (three) months Trial Run of 150 m3 hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room backwash wa
Annual Operation Maintenance and Emergent repair of pipe line of distribution system and Rising main for RATUA PWSS at RATUA- I Dev. Block under Malda Division, PHE Dte. in the District of Malda. 01/01/2024 to 31/12/2024
Laying of Rising Main, Construction of 300 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Pump House, Boundary Wall and Approach Road for implementation of Sayedpur Piped Water Supply Scheme at Harirampur Block.
Day to Day Operation, efficient monitoring and Maintenance, Including IEP Maintenance in all respect for Goalgaon PWSS and Deulbari PWSS (Block - Kushmandi), under Balurghat Division, P.H.E. Dte.
Day to Day Operation, efficient monitoring and Maintenance, including IEP Maintenance in all respect for Rampur Piped Water Supply Scheme (Block - Tapan) under Balurghat Division, P.H.E. Dte.