Loading…
Loading…
276 results • Recent activity
Recovery and Restoration work of Banarhat Railway crossing to Mogalkata Bazar upto joist bridge from 0.00 Km to 8.45 Km, under Jalpaiguri Highway Division in the district of Jalpaiguri for mending up damages occurred due to heavy etc..etc..
Recovery and restoration of Fulbari to Ambari Falakata Road from 0.00 kmp to 7.00 kmp under Jalpaiguri Highway Division in the district of Jalpaiguri for mending up damages occurred due to heavy railfall / flood like situation.
Construction of 01(one) no single cell 3.00 m x 3.00 m RCC Box Culvert at Ch. 5.850 km and 03(Three) nos. Single Cell 2.00 m x 2.00 m RCC Box Culvert at Ch 6.280 km, Ch 6.650 km Ch. 6.950 km at Giladanga Keshoribari Road under Cooch Behar Hwy Divn
Construction of 4(four) cell of size 4 m x 4 m Box culvert at Ch. 2.5 km of Patgram Bhutan cross road under Cooch Behar Highway Division in the district of Cooch Behar.
Construction of Single Cell 2m x 2m RCC Box Culvert at chainage 8.060 km,8.275 km.8.470 km and 9.780 km of Sahudangi to Belacoba Road under Jalpaiguri Highway Division in the district of Jalpaiguri.
Construction of hume pipe culvert in place of existing old and damaged hume pipe culvert with 1400mm Dia and 17nos (Seventeen) rows situated at ch. 1.200 km of Jayanti Bazar to Unishbhisha G.P. office Road, under Coochbehar HWY DIVN