Loading…
Loading…
292 results • Recent activity
Recovery and Restoration (Land Slide) works of Garidhura-Mirik- SimanabustyRoadatCh.44.90 47.10 Km for mending up damages occurs due to heavy rainfall under Darjeeling Highway Division in the District of Darjeeling. (2nd Call)
Repair and Painting Work of Bridge at Ch. 2.4 km of Mirik Bye Pass Road including drainage work under Darjeeling Highway Division in the District of Darjeeling during 2025-26.
Recovery and Restoration of Mathabhanga Cooch behar road from 63 km to 64 km (in stretches) embankment (flood damaged) protection work with bamboo pilling .
Recovery and restoration work of Jamaldah Dhulirhat Road from 0.00 kmp to 3.70 kmp under Coochbehar Highway Division in the District of Coochbehar for mending up damages occurred due to heavy rainfall / flood like situation.
Construction of Strom water drain with cover slab from from 11.4 km to 12.0 km and from from 15.11 to 15.31 km of Tufanganj Dhalpal Bhatibari road under Cooch Behar Highway Division in the district of Cooch Behar.
Recovery and Restoration of flanks and embankment protection works at Panchanan Setu situated at ch. 64 th. Kmp of Mathabhanga- Coochbehar Road ( SH-16) under Coochbehar Highway Division in the district of Cooch Behar .(BRIDGE APPROCAH)