Loading…
Loading…
222 results • Recent activity
PECO NGGC-336 & Filter Element with Gasket
Hiring of Consultants - Milestone/Deliverable Based - Technology Consultants, Subject Matter Experts, PREPARATION OF PRE-FEASIBILITY REPORT FOR KURUNG LOWER HYDRO ELECTRIC PROJECT; Energy etc., Energy (Oil, Gas, Power, Renewables), PREPARATION OF P..
GEGRIP FR 0.75 Red Annealled copper Type D
Valve, Tube, Connector tube, Tee, Union, Pressure gauge, Level gauge
Lubricants, Jointing compound, Sealant compound, Dry lubricant, Consumables, Sealing tape, Sealant, Gasket Jointing sheet, Adhesive, Cutting stones, Cleaning agent, Scrubber
Supply of gaskets, O ring, Teflon, washer, Bushing seal, Teflon tape, Flex-kwik, Devgun putty, Supply of materials as per IS standard for complete epoxy painting single coat primer double coat paint of each transformer, Bucholz Relay, MOG, Breather with silica gel, Oil Temperature Indicator, Winding Temperature Indicator, Pressure Relief Valve, HT Bushing, LT Bushing, Neutral Bushing, OCTC, Prismatic Gauge, WTI CT, Aircell, Complete Marshalling box with all new parts, Radiator valves, HV Turret CT, LV Turret Base Plate, Support Insulator, Radiator, Hardware, Site overhauling charges for 12.5MVA Transformer, Oil Testing from NABL Approved Lab