Loading…
Loading…
5,524 results • Latest
Chair for General Purpose (Q2) ( PAC Only ) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Transformer Turns Ratio Test Set (BHEL) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2026/B/7142371 Dated : 23-01-2026 Bid Document 1/6 Number of Auto Extension count 3 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Air Circulator Type Electric Fan as per IS 2997 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 4, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6767782 Dated : 16-10-2025 Bid Document 1/9 Number of Auto Extension count 2 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
skn--M/S SKN DESIGN CONCEPTS Metal Shelving Racks (Adjustable Type) confirming to IS 1883 Open-type (No side and back sheets) Type Brand: skn--M/S SKN DESIGN CONCEPTS (Detailed Description/Specificati
National Fiber Reinforced Plastic (FRP) Flower Pots of White Color Brand: National (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687774489550 dt.14/01/2026)
ELECTWELL Exhaust Fan 600 mm Brand: ELECTWELL (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687774001165 dt.30/01/2026)