Loading…
Loading…
150 results • Recent activity
Maintenance and Repair to the raincuts and strengthening of Left Fulahar embankment at ch. 29.10km to 29.70km at surjapur G.P.-Kahala within Block-Ratua-I, P.S-Ratua in Dist.-Malda
Restoration work to protect the Existing damage portion of right bank river fulahar for a length of 150m at villGangaramtolaghat, Daraktolaghat, Ramayanpur within Mouza-Maniknagar, Block- Ratua-I, P.s- Ratua, Dist- Malda
Restoration work to protect the Existing damage portion of Left bank of River Fulahar for a length of 100m at -Surjapur within Mouza- Kamalpur, Block-Ratua-I, P.S-Ratua, Dist- Malda
Restoration to the Existing bank protection work at right bank of river Mahananda for a length of 125m in village-Ashapur, Block-Chanchal-I, P.S-Chanchal, District-Malda under Mahananda Embankment Sub-Division-II.
Maintenance and repair to the existing bank protection work on the right bank of river Mahananda at G.P-Maharajpur within Block-Ratua-II, P.S-Pukhuria in District-Malda
Maintenance and repair to the protection work adjacent to the Chator sluice gate (near Eidgaha) close to Mahananda Embankment at Chator, G.P-Sripur-II within Block-Ratua-II, P.S-Pukhuria in District-Malda.