Loading…
Loading…
150 results • Recent activity
River Bank strengthening work along left bank of river Ganga for a length of 115.00 m, near Sumit Roy house at Parparnpara village in G.P.- Par Deonapur-Sovapur, Block- Kaliachak- III and P.S.- Baisabnagar, Dist.- Malda for the year 2026-27
Maintenance and repair work along the right bank of Bhagirathi river at Kadamtala for a length of 250.00 m in Block Kaliachak-I, P.S. Kaliachak, Dist-Malda for the year 2026-27.
Construction of temporary Cross-Bundh across the Ganga River Channel for a length of 35 m in front of Sobhapur BOP in G. P - Pardeonapur-Sovapur, Block - Kaliachak III, P.S - Baishnabnagar, Dist- Malda for the year 2026-27.
Maintenance and repair to the inspection path of Marginal Embankment L/B of River Fulahar from Kalitola to Sankoritola within P.S. and Block - Manikchak , Dist- Malda for the Financial Year 2026-2027.
Maintenance and repair to the inspection path of Marginal Embankment L/B of River Fulahar from Tingharia to Kalitola within P.S.and Block - Manikchak , Dist- Malda for the Financial Year 2026-2027.
Maintenance and repair to the Bhutnidiara circuit Embankment along with the inspection path on the right bank of river Fulahar from Ch. 17.710 km to 19.060 Km under Block - Manikchak and Ratua-I ,P.S.- Bhutni and Ratua.