Loading…
Loading…
1,469 results • Recent activity
SEAL O RING-part no.4400157566, BOLT-part no.4400188337, STUD-part no.4400188338, PLATFORM AS-part no.4400273357, SUPPORT-STEP RUBBER-part no.4400277410, HOSE AS-part no.4400278116, TUBE-part no.4400278190, HOSE-part no.4400279578, VALVE GP SOLENOID AND RELIEF-part no.4400282332, HOSE AS-part no.4400282452, HOSE AS-part no.4400283585, SPACER 13.5X19X27-MM THK-part no.4400287488, SLEEVE-part no.4400287489, TUBE AS-part no.4400289451, TUBE AS- part no.4400289453, VALVE GP ACCUMULATOR CHARGING- part no.4400292446, HOSE AS-part no.4400294029, LOCKNUT M16X2 - THD-part no.4400294297, PLATE-part no.4400294298, CASE AS TRANSMISSION-part no.4400294348, HOSE AS-part no.4400295124, HOSE AS- part no.4400295134, HOSE AS-part no.4400295152, HOSE AS-part no.4400295156, HOSE AS-part no.4400297539, HOSE 21 CM EACH-part no.4400299725, MOUNT-FLEXIBLE- part no.4400300630, PLATE AS-part no.4400300631, PLATE AS-part no.4400300633, BRACKET AS-part no.4400300634, RETAINER-SPRING-part no.4400300637, TUBE AS-part no.4400300638, TANK AS RADIATOR-part no.4400301813, VALVE GP CONTROL-part no.4400301854, TUBE AS-part no.4400301781, TUBE AS-part no.4400301852, TUBE AS-part no.4400301853, TUBE AS- part no.4400301814, TUBE AS-part no.4400301780, TUBE AS-part no.4400301809, TUBE AS-part no.4400301785, PLATE AS-part no.4400301805, BOSS-part no.4400301806, BOSS-part no.4400301807, TUBE AS-part no.4400301782, TUBE AS-part no.4400301811, CLAMP T BOLT-part no.4400301812, TUBE AS-part no.4400301810, HOSE AS- part no.4400295151, BOLT-part no.4400301808
T M CONTRLP MTG KIT, WIRE HARNESS PANEL, JOYSTICK ASSY, HOUSING RH, PR RELIEF VALVE, PCMV ASSEMBLY DANFOSS
High Pressure Washer (Q3) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6847939 Dated : 08-11-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 288510 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Hiring of Air Conditioners and Desert Coolers - Monthly Based - Desert Cooler; As per NIT
Facility Management Services - LumpSum Based - Industrial; Carrying handling and stacking unstacking from storage location of 500 Nos 50 kg each standard weights for testing verification calibration and stamping of all road weighbridges 05 Nos for 73..
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Diesel Covered Jeep ie Bolero or equivalent; The vehicle to be deployed should not be more than three years old from the date of its first RTO registration on the last date of submission..