Loading…
Loading…
33 results • Latest
Operation , Maintenance of various dia D.I./M.S. W/S Pumping Main in AA-I (from CWR within WTP Campus upto Zone-I to Zone-VIII ,from BS-I to Zone-IX to Zone-X) including flow balancing in reservoir , minor repairing of valve/pipeline/specials , De-w
Operation , Maintenance of various dia D.I./M.S. W/S Pumping Main in AA-II (from BS-I to AA-II and CBD area)including flow balancing in reservoir , minor repairing of valve/pipeline/specials , De-watering of pipeline and trench as required and other
Operation , Maintenance of various dia D.I./M.S. W/S Pumping Main in AA-III (from BS-I to OHRs at AA-III A, IIIB, IIIC and different plots like Unitech, Rosedale, UEM, ITI, Saporjee, Arts Acr, Garden Vista, Infosys, NSG etc.)including flow balancing
Construction of Eucalyptus-bullah Barricading for arresting the floating materials, water hyacinth at Upasana Canal Point F DPS_5
Maintenance work of SLS DPS Silicon Valley including civil, electrical and allied at AA-IIE under NTK project
Construction of Eucalyptus-bullah Barricading for arresting the floating materials, water hyacinth at Ghuni Canal Jatragachi DPS_3