Loading…
Loading…
51 results • Recent activity
Temporary water supply Rising Main line across street no. 353 near Tank no 17 and Back up line from Distribution pipe line of CBD for supply of drinking water to Plot No. 11A/25 11A/25/1 for Haj Pilgrims in respect of Haj Operation 2026 and other
Hiring charges of different machineries (Pump, Generator, Pay loader-Hydra Vehicle) round the clock for emergency repair of pipeline for making water supply in connection with Haj Pilgrims for arrival departure in respect of Haj Operation 2026 unde
Fabrication of two number of fire hydrants on street no 374 353 near Plot no. IIA /25 and IIA /25/1 for fire fighting arrangements to improvise structure in connection with arrive, departure of Haj Pilgrims along with fabrication of two M.S. spou
Temporary water supply arrangement including operation maintenance work at Plot No. 11A/25 11A/25/1 adjacent to Madinat-Ul-Hujjaj in connection to newly constructed temporary toilet block for arrival, departure of Haj Pilgrims in respect of Haj O
Emergency cleaning, washing and disinfecting 7500m3 CWR (BS-I) (Floor Area approx 1930.00 Sqm) under New Town Kolkata W/S. Division-I, P.H.E. Dte. during night from 11.00 PM to 4.00 AM preferably within three consecutive nights
Temporary water supply arrangement including operation maintenance work at Plot No. 11A/25 11A/25/1 adjacent to Madinat-Ul-Hujjaj in connection to newly constructed temporary toilet block for arrival, departure of Haj Pilgrims in respect of Haj O