Loading…
Loading…
2,330 results • Recent activity
ECT straight bobbin probes for Moderator Heat Exchanger Tube Material: SA-213 TP 316L Tube OD 12.6 m, ECT flexible bobbin probes for Moderator Heat Exchanger Tube Material: SA-213 TP 316L Tube OD 12.6 m, ECT straight bobbin probes for PHT Heat Exchanger Tube Material: Incoloy-800 Tube OD 12.6 mm X 1.15, ECT flexible bobbin probes for PHT Heat Exchanger Tube Material: Incoloy-800 Tube OD 12.6 mm X 1.15
Shawl (Handloom) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7066653 Dated : 20-01-2026 Bid Document 1/9 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Thermal Casserole and Hotpot (V3) (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7064337 Dated : 20-01-2026 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
o-ring part no 55.194.45.954, o-ring part no 55.073.45.635, bolt part no 55.033.64.435, washer part no 55.906.61.006, sight glass part no 55.400.18.816, fluid connector part no 46.350.16.934.01, filter drier part no 55.400.25.417, o-ring part no 55.400.13.353, valve dual plate check part no 55.040.15.334, gasket part no 55.400.46.008, valve angle part no 55.400.13.301, valve angle part no 55.400.13.353, liquid level gauge part no 47.303.06.438.01, filter mist eleminator part no 5.400.25.708, complete lube-oil o-ring kit part no 56.800.55.298, o-ring part no 55.043.45.635, gasket for oil filter cover part no 55.199.45.009, spring piston part no 55.036.65.924, spring oil filter part no 55.035.60.918, bolt part no 55.017.60.320, oil filter part no 55.006.12.904, valve check part no 55.400.12.335, chiller lubricant
Annual Maintenance service - EPABX System
Dewatering Pumps as per IS 10001 (Q3), Self Priming Centrifugal Pump as per IS 5120 (Q3), Drainage Pump (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7021208 Dated : 13-01-2026 Bid Document 1/14, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Dewatering Pumps as per IS 10001 Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India Schedule 1 EMD Amount (In INR) 42898 Schedule 2 EMD Amount (In INR) 9790 Schedule 3 EMD Amount (In INR) 12732 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 16 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. 2/14 (b). The EMD Amount will be applicable for each schedule/group selected during Bid creation. (c)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Project Director GHAVP Haryana, Department of Atomic Energy, NUCLEAR POWER CORPORATION OF INDIA LIMITED, PMO (Project Director)