Loading…
Loading…
2,335 results • Recent activity
High Pressure Fire Fighting Hose with Delivery Couplings as per IS 14933 (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7003602 Dated : 13-01-2026 Bid Document 1/14, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category High Pressure Fire Fighting Hose with Delivery Couplings as per IS 14933 Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India Schedule 1 EMD Amount (In INR) 23651 Schedule 2 EMD Amount (In INR) 9448 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 16 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. 2/14 (b). The EMD Amount will be applicable for each schedule/group selected during Bid creation. (c)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Project Director GHAVP Haryana, Department of Atomic Energy, NUCLEAR POWER CORPORATION OF INDIA LIMITED, PMO (Project Director)
Platform Step Ladder (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/7056175 Dated : 12-01-2026 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Platform Step Ladder (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6990153 Dated : 09-01-2026 Bid Document 1/12 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Lubricating oil for centrifugal compressor, FILTER OIL CENTRIFUGAL COMPRESSOR, VALVE SAFETY, O RING KIT, G ROTOR PUMP, KIT OIL PUMP O RING PART, FLEXIBLE COUPLING, Check valve Kit, BEARING HIGH SPEED REAR, BEARING HIGH SPEED FRONT, BRG H S THRUST INACTIVE, BRG H S THRUST ACTIVE, SEAL HIGH SPEED SHAFT, GEAR LOW SPEED, BEARING LOW SPEED REAR, BEARING LOW SPEED FRONT, BEARING LOW SPEED THRUST
ROLLED ROUND BAR, DIAMETER: 1 INCH MATERIAL OF CONSTRUCTION: CONFIRMING WITH ASTM A-276 DTD 2010, ROLLED ROUND BAR DIAMETER: 2 INCH, MATERIAL OF CONSTRUCTION: CONFIRMIN ASTM A 276, ROLLED ROUND BAR DIAMETER: 3 INCH, MATERIAL OF CONSTRUCTION: CONFIRMING WITH ASTM A-276 DTD 2010
Customized AMC/CMC for Pre-owned Products - Bi Annual maintenance contract for KCPL make chillers Model PEH 100 Scope of work as per Annexure A; KCPL make chillers Model PEH 100; Annual Maintenance Contract (AMC); Every 45 days between April to Septe..