Loading…
Loading…
2,329 results • Recent activity
Bore dial gauge of range 18-35 mm, Bore dial gauge of range 35-60 mm, Bore dial gauge of range 50-100 mm
LED Batten (Q2), LED Bulkhead Light (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3), LED Luminaire (Recessed Luminaire) (V3) Conforming to IS 10322 (Part 5/Section 2) (Q3), LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7009273 Dated : 31-12-2025 Bid Document 1/24, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Primary product category LED Batten Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India Schedule 1 EMD Amount (In INR) 2620 Schedule 2 EMD Amount (In INR) 935 Schedule 3 EMD Amount (In INR) 11360 Schedule 4 EMD Amount (In INR) 15200 Schedule 5 EMD Amount (In INR) 19200 Schedule 6 EMD Amount (In INR) 10884 Schedule 7 EMD Amount (In INR) 1761 Schedule 8 EMD Amount (In INR) 4110 Schedule 9 EMD Amount (In INR) 7054 ePBG Detail 2/24 Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 15 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). The EMD Amount will be applicable for each schedule/group selected during Bid creation. (c)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Site Director Site Director Nuclear Power Corporation of India Limited, Kudankulam Nuclear Power Project, Kudankulam, Radhapuram Taluk, Tirunelveli – 627 106 (Kudankulam Nuclear Power Project)
100% Neoprene rubber sheet 1 metre X 2 metres X 1.5 mm, 100% Neoprene rubber sheet 1 metre X 2 metres X 3 mm, 100% Neoprene rubber sheet 1 metre X 2 metres X 5 mm, 100% Neoprene rubber sheet 1 metre X 2 metres X 10 mm
Manpower Outsourcing Services - Man-days based - Non-IT Technical; Highly Skilled; Supervisor, Welder, Manpower Outsourcing Services - Man-days based - Non-IT Technical; Highly Skilled; Overtime for Supervisor, Welder, Manpower Outsourcing Services - Man-days based - Non-IT Technical; Skilled; Fitter, Rigger, Machinist, Data Operator, Forklift and Crane Operator, Manpower Outsourcing Services - Man- days based - Non-IT Technical; Skilled; Overtime for Fitter, Rigger, Machinist, Data Operator, Forklift and Crane Operator, Manpower Outsourcing Services - Man-days based - Non-IT Technical; Semi-skilled; Fitter, Rigger, Machinist, Data Operator, Forklift and Crane Operator, Manpower Outsourcing Services - Man-days based - Non-IT Technical; Semi-skilled; Overtime for Fitter, Rigger, Machinist, Data Operator, Forklift and Crane Operator
Portable Liquid Ultrasonic Flow Meter(ONGC) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6936879 Dated : 22-12-2025 Bid Document 1/11 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Laying of gravel road and cross drainage works on Approach Road to R and R Colony, Dharmavaram.