Loading…
Loading…
2,332 results • Recent activity
IMAGE TRANSFER BELT OF SHARP COLOR XEROX MACHINE
BROTHER MAKE LAMINATED TAPE PART NO: TZE-345 WHITE PRINT ON BLACK TAPE (18 MM X 8 MTR), BROTHER MAKE LAMINATED TAPE PART NO: TZE-251 BLACK PRINT ON WHITE TAPE ( 24 MM X 8 MTR)
Hydraulic Hose (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Hydraulic Hose Time allowed for Technical Clarifications during technical evaluation 7 Days Bid Number : GEM/2025/B/6926707 Dated : 22-12-2025 Bid Document 1/10 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Handloom Cotton Bed Sheets (V2) as per IS 745 (Q2), Cotton Pillow (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7107309 Dated : 20-01-2026 Bid Document 1/10, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Handloom Cotton Bed Sheets (V2) as per IS 745 Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Ziton ZP3 Repeater panel model-ZP3_ RDUB1
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - RR Site 5 and 6; Filtration of MOT Lube Oil of total capacity 40 KL by using clean Oil filtration trolley of minimum 200 LPM capacity at RAPS 6 for detail refer BOQ item.., Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - RR Site 5 and 6; Inspection of RAPS 6 Turbine in minor overhauling Turbine of Ukrainian Energy Machine Ukraine bearings Turbine Blades governing system equipment oil flu.., Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - RR Site 5 and 6; Dismantling and assembly of Generator Ukrainian Energy Machines in RAPS 6 for detail refer BOQ item no 3 in scope of work and 1 bid lumpsum qty is equ.., Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - RR Site 5 and 6; Miscellaneous jobs like MOT or TOT cleaning Seal oil Lube oil gasket LLD line diaphragm replacement etc in RAPS 6 minor overhauling for detail refer BO.., Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - RR Site 5 and 6; Deployment of OEM experts for Stage Inspection in minor BSD at RAPS 6 covering Turbine generator and governing system jobs for detail refer BOQ item no.., Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - RR Site 5 and 6; Generator rotor thread out in decoupling alignment and coupling in RAPS 6 minor overhauling for detail refer BOQ item no 6 in scope of work and 1 bid l.., Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - RR Site 5 and 6; Deployment of vibration or balancing experts at RAPS 6 minor overhauling before shutdown for detail refer BOQ item no 7 in scope of work and 1 bid lum.., Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - RR Site 5 and 6; Deployment of vibration or balancing experts at RAPS 6 minor overhauling during startup for detail refer BOQ item no 8 in scope of work and 1 bid lump.., Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - RR Site 5 and 6; In situ Dynamic balancing of TG in RAPS 6 major and minor BSD for detail refer BOQ item no 9 in scope of work and 1 bid lumpsum qty is equal to 1lumps.., Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - RR Site 5 and 6; Rectification of leak if any anomaly Found during Hydro test of stator winding for detail refer BOQ item no 10 in scope of work and 1 bid lumpsum qty i..