Loading…
Loading…
2,348 results • Recent activity
Siren Module unit, Controller unit, Preamplifier unit, EPABX interface unit, Amplifier unit, Control Desk unit, Power Supply unit, Monitoring Unit
Customized AMC/CMC for Pre-owned Products - 2 YEARS CAMC OF VIDEO CONFERENCING SYSTEM AT MUMBAI HQ, WTC MUMBAI, WTC NEW DELHI & JNPP FOR DAY TO DAY MANAGEMENT OF VC SYSTEM WITH RESIDENT SUPPORT; 2 YEARS CAMC OF VIDEO CONFERENCING SYSTEM AT MUMBAI HQ, ..
Steel Cupboard with three lockers as per specification mentioned in specification
Facility Management Services - LumpSum Based - KAPS 1 and 2; Assistance in Maintenance jobs of Control Maintenance Section during BSD of KAPS-1 2026; Consumables to be provided by service provider (inclusive in contract cost)
Single Row Deep Groove Ball Bearing (Without Flange Outer Ring) as per IS 6455 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6930981 Dated : 11-12-2025 Bid Document 1/17, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Single Row Deep Groove Ball Bearing (Without Flange Outer Ring) as per IS 6455 Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Aluminium Tubular Construction Access Tower (3000 mm), Aluminium Tubular Construction Access Tower (6000 mm)