Loading
Loading…
Loading…
28 results • Recent activity
Distempering with acrylic distemper (Oil Bound painting) and partition with toughened glass door shutter in Basic Electronics/Signature lab at Academic Campus.
Providing and fixing of False Ceiling and laying of Vitrified Tile and anti static flooring work in Basic Electronics/Signature lab at Academic Campus.
Supply and installation of VRF Air conditioner in FN 04 classroom
Construction of footpath surrounding area of 100 feet flag mast post in the Institute Campus
Supply and fixing of Marble surrounding area of 100 feet flag mast post in the Institute Campus.
Construction of Shed for Car Parking near Multi Storey Faculty Apartment at Residential Campus. (04 nos plus 08 nos)