Loading…
Loading…
333 results • Recent activity
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Condenser tube cleaning by high pressure jet method, Cleaning SG DMCW Plate Heat Exchanger and Cleaning TG DMCW Plate Heat Exchanger; Service Provider
Custom Bid for Services - Subscriptions of Microsoft 365 Email System Services Similar Category Office Productivity Suite
Hiring of Consultants - Milestone/Deliverable Based - Technology Consultants; Energy etc., Energy (Oil, Gas, Power, Renewables); No; Onsite
SS PIPE OD-18MM, THICK 3MM For OIL LINE, SS PIPE OD- 25MM, THICK 3MM For SONIC BLOWER, SS PIPE OD 624MM, For CENTRE FEED PIPE, CS Seamless pipe OD 10X Thickness 1.5, CS Seamless pipe OD 28X Thickness 3, CS Seamless pipe OD 25X Thickness 4, CS Seamless pipe OD 16 X Thickness 2.5, Pipe CS Seamless 89 OD X 15.24mm THK, CS Pipe 18 OD X 1.5 MM THK, CS SEAMLESS PIPE O.D 12 x 1.5 THK
High Pressure Fire Fighting Hose with Delivery Couplings as per IS 14933 (Q2) (3 (3 ))
Supply of Cable