Loading…
Loading…
409 results • Latest
Ceramic Crucibles and Agate Mortar Pestle Sets
Cartridge Based Needleless Electrospinning Machine
Pouch Cell Battery Equipment
BET Surface Characterization Analyzer (As per specifications)
Low Temperature Pulverizing Unit
METALLIC ENCLOSURE CABINET AS PER NMRL SPECIFICATION
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Event or Seminar or Workshop or Exhibition or Expo Management Service - National; Theme Based Events; Conceptualization and Planning, Coordination and Staffing, Participation arrangements, Venue Development, Complete Execution of Activity; Buyer prem..
Micro/Semi-Micro/Analytical weighing balance (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Recirculating chiller (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7080159 Dated : 08-01-2026 Bid Document 1/10 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority DRDO Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 150000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 18 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. 2/10 (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Director Defence Metallurgical Research Laboratory, Post: Kanchanbagh, Hyderabad - 500 058. (The Director, Dmrl)
Ferric Oxide Red, Nickel Oxide Green, Cobalt Oxide Black
Custom Bid for Services - Advanced Trial data Processing, Signal Analysis and Computation Hub for project WAS4NET Similar Category Data Analytics Service Massive Data Processing Service
data wall display (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Bid Number ( ) : GEM/2025/B/6186466 Dated : 05-05-2025 Bid Document 1/9 Time allowed for Technical Clarifications during technical evaluation 2 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 37500 ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 5.00 Duration of ePBG required (Months) ( ) . 39 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : DIRECTOR Dmsrde Kanpur, Department of Defence Research & Development, Office of DG ( NS & M), Ministry of Defence (Director Dmsrde) MII Purchase Preference MII Purchase Preference Yes MSE Purchase Preference 2/9 MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Digital Storage Oscilloscope (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6713404 Dated : 22-09-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 41 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : DIRECTOR Defence Laboratory, Jodhpur, Department of Defence Research & Development, Office of DG ( NS & M), Ministry of Defence (Director) Splitting
Nitrogen Gas, 99.995% Purity, Helium Gas
Artificial EM Material Glass Fabric
Tantalum carbide pack size 50gm, Hafnium IV carbide powder pack size 25gm, Tantalum disilicide pack size 50gm, Niobium carbide pack size 100gm, Silicone dioxide pack size 100gm, Titanium IV carbide powder pack size 25gm, Molybednum disilicide powder pack size 250gm, Titanium silicide pack size 250gm, Zirconium oxide monoclinin pack size 500gm, Zirconium boride pack size 250gm, Graphite powder pack size 1kg, Aluminium oxide powder pack size 500gm, Hafnium IV oxide powder pack size 100gm, Tantalum oxide pack size 100gm
Custom Bid for Services - Ring rolling of Ti-6242S as per Specification and Scope of work-01 job Similar Category Operation And Maintenance Of Other Machines And Plants
Power amplifier and TR Cabinet, Supercapacitor power supply cabinet, Power Distribution Cabinet, Front end and SNS Cabinet, Array Junction Box Cables and connectors, TSG Junction Box and ethernet switch, Testjigs for module testing, Spares and Accessories, Job work development cost of transmitter and front end receiver, Job work installation support of transmitter and front end receiver
Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Filtration Process) (V2) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Micro Hardness Tester
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Micro Spatula-IS:3888 (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Design, Construction and supply of steel boat
Orthophosphoric Acid, Assay 88%, Pack size 5 Litres
Custom Bid for Services - Job work for setting up of system integration and test facility for T-LFBMS Similar Category Operation And Maintenance Of Electro-Mechanical Installations Operation And Maintenance Of Other Machines And Plants Operation and Maintenance Of Electrical Systems/Electrical Installations
Integrated Virtual Meeting System for Video Conferencing
Customized AMC/CMC for Pre-owned Products - AMC For Josts Make Battery Operated Platform Trucks -17 Nos For 3 Years - 01 Job; Nil; Annual Maintenance Contract (AMC); Bi- Monthly; No
Customized AMC/CMC for Pre-owned Products - AMC for high temperature vacuum furnace and vacuum strip casting furnace for 03 years - 01 Job; Nil; Annual Maintenance Contract (AMC); Once in four months; No
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6862608 Dated : 24-11-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 10 Number of Auto Extension count 3 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority DRDO Auto CRAC Days 60 Evaluation Method Total value wise evaluation Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 28 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : The Director DMRL, P.O. Kanchanbagh, Hyderabad-500058 2/8 (Director)
EDM Brass Wire (Q3)
iPAD OS Based High End Tablet
Supply and Establishment of Switched Multi Probe Spherical Near Field EM Measurement Facility
Custom Bid for Services - Execution of mechanical design, simulations and software development for ship sonar Similar Category Operation And Maintenance Of Electro-Mechanical Installations Operation And Maintenance Of Other Machines And Plants Operation and Maintenance Of Electrical Systems/Electrical Installations
Insulation Tester (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
UHP Grade Nitrogen gas, 99.999% Purity
Pressure Burst Disc CF1Point33, Gasket Cu CF1Point33, HV Cable HV 8 Feet, Flood Gun Assembly - Nano Fab, Crsn-res Turbo Pump Station DN-40 ISO KF, FRU Ion Source Replacement Kit for Nano Fab, Aperture Holder with Apertures For He or Ne - GFIS, Synthetic Oil LVO 700 for Vaccuum Pump - 1 Litre
Rectangular Plastic Container 50 ml, Rectangular Plastic Container 500 ml, Cardboard Rectangular Box File, Measuring Tape 30 Meter, Wooden Exam Pad, Steel Scale 30 cm, File Folders 10 inch length, Display File A4 size, File Folder Jute 10X14 inch, Kangaro Stapler 24by6 HP-45, HT Tape 10 meter Roll, Kangaro Stapler 10by4, Stapler pin Size-10 width-7.1mm, Stapler Pin Size-23by8 Width- 12.8mm, Kangaro Stapler 23by8 Width-6mm, Scissor Size- 80X160 mm, Transparent Pouch 3X4 inches, Transparent Pouch 10X14 inches, Transparent Plastic Pouch 7X10 inch, Transparent Plastic Pouch 3X5 inch, Zip Lock Transparent Pouch 5X7 inch, Zip Lock Transparent Pouch 6X8 inch, Steel Measuring Tape 3 Meter, Packing Tape size width-72 mm Length-80 meter, Adhesive tape 1.25cm X 5meter, LED Torch Dia-50mm Capacity-1.2Ah, L shaped transparent folder A4 size, Battery 1.5V AA type, AAA 1.5V battery, Acrylic Table Top Elevator Writing Desk, A4 size spiral Writing Pad, Double Sided carbon tape, width-25mm Length-10m, Fevikwik 20gm, Glue stick -15 g, 3M PVC HT Tape, Gum Bottle 150 ml, Steel Knife Blade, Correction Pen, Teflon tape Length-10m width-0.5 inch, Face Mask Stergic, Pencil HB, Sticky Notes 50X75 mm, Highlighter Pen, External DVD writer, Reflective Tape Length-2m, Hand Held 100 KHz digital multimeter - Fluke 101, Non Sparking Diagonal Cutting Plier, Size-150mm, Polyester packing Strip, Single sided vinyl Tape Size-2inch, Width- 30mm, Disposable Surgical Sterile Synthetic Gloves, Induction Heater 1800W, RO and UV Water Purifier with Pre Filter set-8L, Wet and Dry Duty Cleaning Vacuum Cleaner 60millibar, Electric Kettle-2L, Eraser, Ball point blue pen, A4 Comb binding punch machine, Binder clip with two hinged wire handles 32x44 mm, 700 MB Read Write Disc CD, Wooden Pen stand, Plastic Scale size 30 cm, Single hole punch, Extension board 4Socket 6Amp. length-5m, Extension board 6Socket 16Amp. length-10m, Line Tester, Insulated wire stripper, Wall mounted Battery Powered Electronic Clock, Keyboard and Mouse Combo Wireless, Cups and Saucers Tea Set, Doors mat 30cm x18cm, Dustbin with lid- 6L, Door Curtains 8ft.x 4ft., Paper weight- 200gm, Pencil Sharpner, Pen type marker pen, Permanent Markers, Alcohol based with 2mm bullet tip - Black, permanent blue marker bullet tip, NOTE BOOK 30x21cm - 240 Pages, Box File, 200 Pages single rule Register, 100 pages single rule Register, PVC file with clip, Ring file
TECHNICAL MODEL OF NAVAL SHIP SHOWCASING CATHODIC PROTECTION TECHNOLOGIES AND PAINTS, TECHNICAL MODEL OF SUBMARINE FITTED WITH AIP DEVELOPED BY NMRL
GLOVE BOX WITH 4 PORTS
Clinical Apron (Q2), Surgical Face Masks Conforming to IS 16289 (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Chemical Splash Proof Goggle (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6935646 Dated : 19-12-2025 Bid Document 1/10 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Primary product category Plain Copier Paper (V3) ISI Marked to IS 14490 Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority DRDO Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 59750 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 3 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this 2/10 Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Director Defence Metallurgical Research Laboratory, Department of Defence Research & Development, Office of DG ( NS & M), Ministry of Defence (The Director, Dmrl)
PVDF based Prototype Star Array
Tetra Ethyl Ortho Silicate (98% Pack size 10 liter)
Custom Bid for Services - Solutions for low power wireless communications and real-time tracking Similar Category Hiring of Consultants - Milestone/Deliverable Based Non IT Professional Service (version 2)
Power Supply for Electrochemical Workstation(MAC, M204) (Pat No. MAC204, PSU. S)