Loading…
Loading…
7 results • Recent activity
brother Electrophotography/Xerography (Laser/LED) Monochrome, brother Electrophotography/Xerography (Laser/LED) Monochrome (Black) A4 and Legal Size Multifunction Printer (MFP)
CyberPower Line Interactive UPS with AVR of Rating 0.6 KVA With, CyberPower Line Interactive UPS with AVR of Rating 0.6 KVA With Warranty of 2 Years
brother Electrophotography/Xerography (Laser/LED) Monochrome, brother Electrophotography/Xerography (Laser/LED) Monochrome (Black) A4 and Legal Size Multifunction Printer (MFP)
acer Intel Core i5-13500 All in One PC
Manpower Outsourcing Services - Fixed Remuneration - Admin; Data Entry Operator; Graduate, Manpower Outsourcing Services - Fixed Remuneration - Admin; Multi- tasking Staff; Secondary School
Air Walker/Stroller - Outdoor Gym Equipment (Q3), Surf Board - Outdoor Gym Equipment (Q3), Leg Press - Outdoor Gym Equipments (Q3), Chest Press - Outdoor Gym Equipments (Q3), Shoulder Builder/Arm Wheel - Outdoor Gym Equipment (Q3), Twister - Outdoor Gym Equipment (Q3), Parallel Bar - Outdoor Gym Equipment (Q3), Sit Up Board - Outdoor Gym Equipment (Q3), Garden Swings (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7025078 Dated : 19-12-2025 Bid Document 1/23, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Garden Swings Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No