Loading…
Loading…
106 results • Recent activity
M/R to repairing of Cross Drainage structure at 300m of Dy 1 of L.B.M.C and clearing bed silt from 150m to 300m of Dy 1 of L.B.M.C in connection with Lipania I Scheme.
MR to Inlet and Bank Strengthening at 15.00 m of Dy 06 of RBMC in c/w Taragonia I Scheme.
M/R to Spillway gates and head regulator gates including gate operation and gauge reading for Kharif Irrigation in connection with Majra I Scheme during the year 2026-27.
M/R to spillway gates and head regulator gates including gate operation and guage reading for kharif irrigation in connection with Taragonia I Scheme during the year 2026-27.
MR to Main Canal Distributaries in cw Kumari Irrigation Scheme under Purulia Irrigation Division PS Barabazar Block BarabazarDist Purulia for the year 2026 27
M/R to spillway gates and head regulator gates including gate operation and guage reading for kharif Irrigation in connection with Moutorejore I Scheme and Bandajore I Scheme during the year 2026-27.