Loading…
Loading…
1,398 results • Recent activity
Internally coated Tube-bundles of Well Fluid Heaters- E- 2100 & E-92015 of Heera Process
Annual Rate Contract for Civil Works for Deployment of Work over Rig at Various Well Sites at Cambay Asset for a Period of 3 Years
Enamel, Synthetic, Exterior (A) Undercoating (B) Finishing (V4) Confirming to IS 2932 (Q3), Thinner For Epoxy Paints (BHEL) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6970960 Dated : 15-12-2025 Bid Document 1/26, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Enamel, Synthetic, Exterior (A) Undercoating (B) Finishing (V4) Confirming to IS 2932 Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority CONCERNED ONGC INDENTOR Auto CRAC Days 10 Quality Assurance Plan document 1765460196.pdf Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 0.03 ( ) Duration of ePBG required (Months). 14 (a)., EMD & Performance securityshould be 2/26 in favour of Beneficiary, wherever it is applicable. Beneficiary : Manager F&A 799014, Oil and Natural Gas Corporation Limited, Ministry of Petroleum and Natural Gas (Oil And Natural Gas Corporation Limited) (Oil And Natural Gas Corporation Limited) (Oil And Natural Gas Corporation Limited)
THERMOSTATIC WATER BATH
Welding electrode E-7018 as per IS 814: 2004/AWS SF A- 5.1, M. S. ELECTRODES AWS-E-7018 3.15MM, M. S. ELECTRODE AWS-E-7018 4MM, MS ELECTORES E7018 5MM, MS ELECTRODES E-6013 2.5MM, WELDING ELECTRODE AWS-E-6013-3.15MM, MS ELECTRODES E-6013 4MM, ELECTRODE SS 3.15 MM 1PKT= 2.5K, ELECTRODE SS 4.0MM, ELECTRODE WELDING SS E316-16 3/16" (5.0*, ELECTRODE WELDING E10018-D2 1/8" (3.2MM), ELECTRODE WELDING E10018-D2 5/32" (4.0M*, ELECTRODE WELDING E10018-D2 3/16" (5.0M*, SAW FLUX F7P2 FOR AWS/SFA5.17: EH-14, SAW WIRE AWS/SFA5.17: EH-14, 2.5MM, SAW WIRE AWS/SFA5.17: EH-14, 3.15MM, WELDING ELECTRODE E-106 4MM, ELECTRODES CI 3.15MM, WELDIG ELECTRODE CAST STEEL 4MM, MIG WELDING WIRE
PRODIGISIGN Signing Certificate