Loading…
Loading…
193 results • Latest
Sagardighi - Siteshnagarghat Road patch repairing work from Ch. 6.20 Km to 11.80 km under Murshidabad Highway Division-I during the year 26-27
Mirzapur - Fultala More to Anuppur Road patch repairing work from 1.80 km. to 2.20 km. and 2.70 km. to 5.20 km. under Murshidabad Highway Division-I during the year 26-27
Bulbulchandi Katlapukur Road from 4.50 km to 6.890 km and from 7.025 km to 14.500 km (excluding 492.00 mtrs existing Mastic Zone), Surfacing work under Malda Highway Division in the District of Malda. Project lD PD252648174S000 (2nd CALL).
Collection of Required Parametric Data and Preparation of Pavement Strengthening Design for Chakdaha Nimtala Road from 0.00 Km to 9.00 Km and from 17.600 Km to 18.710 Km under Kalyani Highway Sub-Division of Nadia Highway Division No. II
PerformingSub Surface Utility Engineering (SUE)Survey using Ground Penetrating Radar (GPR)and Electronic Cable and Pipe Locator (EPL) to find out the depth , alignment and diameter of underground utilities like Water/Gas Pipes, Electrical cables etc
World Bank NH Campus (Behind Asansol Girls College), Asansol 713 304