Loading…
Loading…
204 results • Latest
Natabari-Bhatibari Road-1.50 km to 3.50 km and Chilakhana-Natabari Road from 5.00 kmp to 9.80 km pre-monsoon potholes repair work under Cooch Behar Highway Division in the district of Cooch Behar.
Emergent potholes repairing of Chetra Chekapdera Bazar (13th Kmp of Dinhata Balarampur Road) to Nazirhat Bazar road via Balakura New Bazar in stretch from 0.00 to 4.05 km, under Cooch Behar Highway Division in the district of Cooch Behar.
Patch repairing works of 0.00 km to 2.00 km from 8th km of Pundibari-Baneswar (Chagolber Chowpati) to Gopalpur Health centre Link Road under Cooch Behar Highway Division in the district of Cooch Behar .
Kaliachak to Golapganj Road from 4.00 km to 6.00 km Potholes repairing work in stretches under Malda Highway Division in the District of Malda during the year 2026 2027.
Preparation of Detailed Project Report (DPR) for Strengthening of Bahina - Andi via Kamraghat and Hazipur Road from 0.00 kmp to 22.35 km, under Birbhum Highway Division- I, in the district of Birbhum
Supply of 1 No AC Motor/Maxi Cab on hired basis