Loading…
Loading…
1,021 results • Recent activity
Emergent repair of road surface damaged by various utility services at Lauhati - Haroa Road from Ch. 13.10 Km. to Ch. 13.60 Km., Ch. 14.70 Km. to Ch. 14.80 Km. and Ch. 15.70 Km. to Ch. 18.00 Km. (Mastic and Concrete Block Surface) under Barasat High
G.T. Road to Talandu Railway Station from 0.00 kmp. to 1.43 km., Widening and Strengthening work under Hooghly Highway Division No.- II in the district of Hooghly. (3rd Call)
Bongaon Jhowdanga Panchpota Road from Ch. 6.15 Km to Ch. 7.55 Km and from Ch.11.75km to Ch. 13.95 km, Temporary restoration of Hard shoulder work in stretches under Bongaon Highway Sub Division of Barasat Highway Division No. II, Govt. of West Ben
Patch repairing work from 0.00 km to 4.00 km and 5.30 km to 8.30 km in stretches of Kedar Roy road under Mollarpur Highway sub Division of Birbhum Highway Division-I in the district of Birbhum during the year 2025-26
Patch repairing work from 18.00 km to 25.50 km and 28.00 km to 30.80 km in stretches of Mollarpur Majhipara Bolpur road under Mollarpur Highway sub Division of Birbhum Highway Division-I in the district of Birbhum during the year 2025-26
Emergent Repairing of Chanditala Seakhala Champadanga Road (in stretches) from Ch. 26.00 kmp. to 27.00 kmp. from Ch. 29.40 km. to 29.90 km. Providing Bituminous Cold Mix, Repairing Potholesand Brick stiching in various stretches from 27.10 km. to 27.