Loading…
Loading…
1,027 results • Recent activity
Repairing potholes with shelmac PR on different spot of K.N.I. Avenue (ch. 6.1 kmp. to 8.05 kmp.) and VIP Flyover (both flank) as and when required under Baguihati Highway Sub Division of Barasat Highway Division No-I.
Lifting, repairing and lowering submersible sewerage pump at different place under Baguihati Highway Sub Division of Barasat Highway Division No-I. in the district of North 24 Parganas.
Emergent Protection work for flank of Domohani Bazar to Teesta Bridge approch road from 0.00 km to 1.30 km under Jalpaiguri Highway Division
Restoration due to Laying Gas pipeline using HDD method from Ch 0.00 km to Ch 2.287 km RHS 90 mm Dia.MDPE pipeline 2.287 km and ch1.300 km to Ch2.100 km LHS 32 mm Dia MDPE pipeline 0.800 km Total length 3.087 km along with the Bankura..
Chhatna-Susunia-Kusthalia road at Ch-13.91 km Chandra-Dhapali Repairing of Both sides Bituminous Road Approaches of the Temporary Diversion Road under Bankura Highway Division in the district of Bankura.
Rebuilding of Badu - Kharibari Road from Ch.1.280 Km. to Ch.2.280 Km. (Rupa Shoe House to Modern Auto, R/L- 1.000 Km.) against the damages to be done due to laying of electric cable for proposed 33/11KV Sub-Station at DTC Project (Kamduni) Rajarh