Loading…
Loading…
1,016 results • Recent activity
Patch repairing work from 5.00 km to 10.00 km and 11.00 km to 14.00 km in stretches of Nalhati Rajgram Road under Rampurhat Highway sub Division of Birbhum Highway Division-I in the district of Birbhum during the year 2025-26.
Restoration work for Laying Natural Gas supply pipeline 63 mm dia MDPE pipeline on RHS of Alipurduar Kumargram road from chainage 0.00 km to chainage 1.680 km under Alipurduar Highway Division in the district of Alipurduar
Restoration of Right side flank from Ch. 0.100 Km to 0.120 Km of Chakchaka to Khoardanga Bazar Road Netaji Road under Alipurduar Highway Division in the district of Alipurduar during the year 2025 2026.
Engagement of one Luxury Taxi - Bharat Stage III and above Motor Cab or Maxi Cab (with Engine Capacity Less than or Equal to 2000 C.C. with Air-Conditioned) diesel or CNG engine on daily hiring charge for the office use of the Chief Engineer - II
Supply of AC Motor Cab on hired basis
Supply of Non AC Motor Cab on hired basis