Loading…
Loading…
35 results • Latest
Upgradation and Reconstruction of Sirmaur - Dabhaura Section of NH-135B from Km 36/700 to Km 73/813 to two lane with paved shoulder Configuration in the State of Madhya Pradesh on EPC mode
Upgradation of Shahgarh Buxwaha Narsinghgarh Damoh section of NH-34 (from Ch 113/00 to Ch 176/500) to 2-LPS in the State of Madhya Pradesh on EPC Mode
Construction/Upgradation of Existing Road to Two Lane with Paved Shoulder for the Stretch of Tikamgarh Badagon Ghuwara Shahgarh from Km 75/000 to Km 155/700 (NH-539) in the State of Madhya Pradesh on Hybrid Annuity Mode
Upgradation of Existing Intermediate Lane Flexible Pavement to 2 Lane with Paved Shoulders Flexible Pavement from Km 0.000 (Orchha) To Km 75.000 (Length 75.000 Km) on Orchha Tikamgarh Shahgarh NH-539 in the State of Madhya Pradesh on EPC Mode
Widening and strengthening of Daringbadi ghat portion from km 231.000 to 256.000 (Design chainage from km 229.500 to 256.468) of NH-59 under NH(O) in Hybrid Annuity Mode Plan 2023-24 in the State of Odisha (Design length 26.968 Kms).