Loading…
Loading…
54 results • Recent activity
Rectification of Black Spot at Binodpada NH-57 from Chainage 267.400 to 267.900 under Road Safety Annual Plan 2025 26.
Strengthening with IRQP on Bameetha - Satna Section of NH-39 from Km 57/160 to Km 155/000 (Total length 97.84 Km) in the state of Madhya Pradesh on Item Rate (Percentage) Basis
Performance Based Maintenance Contract Work of on Flexible and Rigid Pavement of Satna-Bela Section (Four Lane and Service Lane) Km 155/000 to 202/040 of NH-39 road (length 47.04 Km) in the State of Madhya Pradesh
STMC estimate from Km.0.000 to 1.600 and Km. 59.000 to 59.921 Km. TL and multilane equivalent to 14.482 Km. of 2L plus PS of of NH 316 and 59.921 to 90.200 Km. PKL for the year 2025 26.
New Construction of Major Bridge at Nagavali River on NH-326 at Ch-192.830 in the state of Odisha on EPC mode
Strengthening of 2 lane with paved shoulder from Surajpur (Shilfili) to Ambikapur (from Km 363.000 to 373.500, total length of 10.50 Km) section of NH-43 on EPC mode in the State of Chhattisgarh