Loading…
Loading…
46 results • Latest
Consultancy Services for Preparation of feasibility study detailed project report survey and preparation of land plan for widening to two lane with paved shoulder on NH 169A from Km. 30.75 to Km. 51.60 Agumbe Ghat in the State of Karnataka
Widening Re-Construction to Four Lane from Km 0.000 to Km 15.870 Near Miriyan Telangana Karnataka Border Chincholi Section of NH 167N in Kalaburagi District in the State of Karnataka on HAM under Annual Plan 2023 24
Construction of Bypass to the Holenarasipura Town from Km 87.280 near Chikknahalli to Km 97.580 Near Hullahalli on NH 373 in the State of Karnataka on EPC mode under NH O Annual Plan 2023 24
up gradation to Two/four lane with paved shoulder configuration of Tuljapur Naldurge Akkalkot road from Naldurge to Akkalkot of bvalance work from Ch 30.884 and ch. 70.800 of Nh 652 on EPC mode in the state of MAharashtra
Rehabilitation and upgradation of NH 548B from km 289.300 to km 342.890 Maharashtra Karnataka Border to two lane with paved shoulder configuration in the state of Maharashtra on EPC mode Total length 52.556 km
Construction of a 2L PS Road Over Bridge ROB t km 2 135 parallel to the existing ROB and reconstruction of existing 2 lane ROB at km 48 557 to 4L PS standards in the state of Maharashtra on EPC mode