Loading…
Loading…
148 results • Recent activity
Widening and strengthening of (i) Pipri to Degaon via manthani from km 0/0 to 1/0 and Km 2/200 to 9/500, (ii) Lead road to Guthpa from km 0/0 to 3/500, (iii) Guthpa to Aloor from km 0/0 to 3/200 in Nizamabad District
One time improvement of existing road from Km 0.0 to 2.360 Km 26.930 to 30.0 and Km 30.270 to 30.6 of NH 365A (left over bits) of Kodad Khammam Section in the State of Telangana on EPC mode
Urgent Repairs to Quality Control Lab in office of the Executive Engineer, Rand B NH Division, Ananthapuramu in the State of Andhra Pradesh
Urgent Repairs to Quality Control Lab in office of the Superintending Engineer, R and B NH Circle, Ananthapuramu in the State of Andhra Pradesh
Construction of road from Echoda road (old NH 7) to Dedra village in Adilabad District
Widening and Strengthening of Muduguntal to Chapta road via Sanjeevarao pet from km 0/0 to19/2 (work in km 0/ to 6/0 and 13/0 to 19/2) in Sangareddy Dstrict(under CRF Scheme 2025-26)