Line Check Valve S20A1, Line Check Valve S30A5, Pressure Relief Valve DBDS20 G1X forward slash 315, Pressure Relief Valve DBDS10 K1X forward slash 050, High Pressure Switch desh HED 8 OA desh 2Xforward slash 350K14S, Low Pressure Switch desh HED 8 OA desh 2Xfroward slash 50K14S, Flow Control Valve DVE desh 1601 point X forward slash P forward slashH, Flow Control Valve DVE desh 0801point X forward slash P forward slash H, Filter Element and Clogging Indicator DFBN forward slash HC240 G 10 D1 point Xforward slash desh L24 desh B6, Line Check Valve S30A1 point 0 forward slash, Pressure Relief Valve Loading and Unloading Valve DBW10 B2 4Xforward 315 6E desh G24 N9K4, Directional Control Valve desh 4WE10 J 3X forward slash C G24 N9K4, Flow Control Valve desh DV desh 10 01 point Xforward slash P forward slash H, Flow Control Valve desh DRVP desh 16 desh 01 point Xforward slash P forward slash H
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7125662 Dated : 19-01-2026 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 179000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Purchase of consumables and equipment
Hiring of Consultants - Milestone/Deliverable Based - M/s GE Vernova T&D India Limited (Formerly Known as GE T&D India Limited) Expert for Hiring of expert services from OEM M/s GE Vernova T&D India Limited to diagnosis HV side R- phase measurement is..
Customized AMC/CMC for Pre-owned Products - LP Compressors; ELGI Equipment Limited; Annual Maintenance Contract (AMC); Total Twelve mandatory visits bimonthly visit during the contract period of 02 years will be made for schedule checking and to rec..
Purchase Of INDICATOR & CONTROLLER 2 RELAY O/P, Purchase Of PILOTREK Pulse RADAR Level Transmitter Order, Mandays charges, Purchase Of Capacitance Level Transmitter With Coaxial Reference Probe