Loading
Loading…
Loading…
10 results • Recent activity
Grouting work of Pressure Shaft at Parbati-III Power Station during lean Period of 2025-26
Repair work of water conductor system (Head Race Tunnel) of Parbati-III Power Station during lean Period of 2025-26
Restoration of 03 no. 11 KV Line from 33/11 KV Substation, Behali to Power House and Sapangini Township at Parbati-III Power station
Repair along with HP-HVOF coating of 01 set Damaged Guide Vanes of 130 MW Francis Turbine at Parbati-III Power Station