Loading…
Loading…
62 results • Recent activity
Thermal Insulation of Steam lines, Feed Water lines, LPHs, HPHs, Valves, NRVs during Capital Overhauling of Turbine of unit no. 6, 2x250 MW, PTPP, Parichha
Operation of bowl mill bay hoist and preventive/breakdown maintenance of bowl mill, fans area hoist of Unit 5 and 6 for 365 Days of 2x250MW, CTPS, Parichha. (Mill area Hoist 12.5T, PA and FD Fan /Motor Hoist 3.5/15T and ID Fan Hoist 17.5T).
Overhauling of flue gas damper assembly of APH inlet/Primary/Secondary air, Servicing of ESP inlet gate, Reclamation/Repairing of worn-out coal Nozzle, Replacement/Repairing of bends in boiler during the Capital overhauling of UNIT6 of 2x250MW
Collection of various sample, RCF coal rakes coal, flue gas, pulverized coal, bottom ash, fly ash, oil, hydrogen gas, water samples 2x210MW 2x250 MW PTPP, Parichha. for various chemical analysis to be done at respective central chemistry labs
Assist in Preparation of chemical solutions for dosing, in deaerator and boiler, assistance in various chemical testing of water samples in SWAS lab in shift 2x250 MW and 2x210 MW PTPP, including loading and unloading of heavy chemicals from central
Supply of Various Medical Equipment in PTPP, Parichha, Jhansi (UP)-284305.