Loading…
Loading…
2,860 results • Latest
Adavance action at Plantation site RDF-II Mataji ki Pass Sukhpura 50 Ha.
NIT NO 24/2026-27 JCB WORK GGC (KHAI FENCING TRENCH GADDHA KHODNA)
CONSTRUCTION OF PACCA BEDS AND REPAIR OF WATER TANKI AT NURSERY PIPLIKHEDA RANGE BEGUN 2026-27
ADAVNCE WORK
Advance Action work at RDF-II Dalpatpura-A 50 Ha.
making of contour furrows In clay Loam soil &amp Hard soil upto Boulders.At Pushkar Biological Park
Advance Work at Plantation Site RDF-II Chudla 50 Ha and Dariba-I 50 Ha.
Construction Of pacca boundary Wall,Akhed se Barwas 1000 RMT
Supply of Study Equipmants in Government Higher Secondary School, pahadiya madhorajpura, Range fhagi Under Entry Point Activites (RFBDP) as per H-Schedule
Complete Interior and Enrichment of Interpretation Center at Range Palighat
Rate Contract for Providing Hydraulic Excavator 3D, JCB Machine with Driver and Fuel and Tractor with Trolley with Driver and Fuel
Advance action work at RDF-II Kairpura-III 50 Ha.
रेंज भीनमाल के निंबावास पंचायत लेण्ड वृक्षारोपण में फेसिंग कार्य
Creation of Crocodile View Point Jakham Barrior Range WL Jakham dcfwl chittorgarh
Maintenance of 2 nos. enclouser Naya Pani Karna ka bas
MISCELLANEOUS WORK AND TOILET SANITARY WORK AT INTERPRETATION CENTER RANGE PALIGHAT
रेंज भीनमाल के डूंगरवा पंचायत लेण्ड वृक्षारोपण में फेसिंग कार्य
Supply of RCC pillar size 2.40mtr
Creation of Canteen at Aarampura Range WL Dhariyawad chittorgarh
PIPE DRAIN AND RAMP WORK
Supply of galvanised weld mesh size 5X5 inch height 1.5mtr dia 2mm(14 Guage)
Construction of Eco Exhibition Centre under Panch Gaurav Ek Jila Ek Vanaspati Prajati - Rohida Scheme in DCF Office, Public Park, Bikaner
Hiring of 9 Man with Machine
painting work(especially wild animals)
DEVELOPMENT OF GARDEN AT CCF &amp FD CAMPUS
TILE FLOURING WORK FALS CEILING WORK AND FINISHING WORK OF INTERPRETATION CENTER
FURNITURE WORK AT CCF RESIDENCE
ELECTRIC WORK OF INTERPRETATION CENTER AT RANGE PALIGHAT
advance soil work at range hindoli
PLASTER WORK OF INTERPERATION CENTER AT RANGE PALIGHAT
advance soil work at range nainwa
Selfie Point at Aarampura Range WL Dhariyawad (AS PAR G-SCHEDULE) DCFWL CHITTORGARH
JOGIMAHAL HALL UPGRADATION
advance soil work at range bundi
advance soil work at range k patan
For executing advance soil works—such as trench fencing, trenches, and ponds—allocated under various schemes in the Sirodi Range using machinery and JCB equipment.
DISMENTLING OLD DCF HOUSE
नर्सरी 9 मील रेंज मंडोर में पक्के बेड्स निर्माण कार्य
For executing advance soil works—such as trenching, fencing trenches, and ponds—allocated under various schemes in the Pindwara Range, using machinery or JCB equipment.
Gazebo Hut Jakham River Range WL Jakham (AS PAR G-SCHEDULE) DCFWL CHITTORGARH
Selfie Point at Kopa Dam Range WL Jakham (AS PAR G-SCHEDULE) DCFWL CHITTORGARH
Gazebo Hut Aarampura Range WL Dhariyawad (AS PAR G-SCHEDULE) DCFWL CHITTORGARH
रेंज गोगुन्दा का कार्यस्थल ANICUT CONSTRUCTION 6 NOS. (MJSA 2.0 PHASE 2) (AS PER G- SCHEDULE)
रेंज भीण्डर अधीन वन नाका भटेवर का वनखण्ड फ्लेट-ए (अमरख महादेव लेपर्ड कन्जर्वेशन रिर्जव) में पक्की दिवार निर्माण कार्य 875 र.मी. (As per G-Schedaule)
Gazebo Hut Kunthariya Range WL Dhariyawad (AS PAR G-SCHEDULE) DCFWL CHITTORGARH
CON.OF SEED STORE ROOM
River View Point Jakham River Range WL Jakham as per G-SCHEDULE DCFWL CHITTORGARH
RO Water Cooler at Various Places at Range WL Dhariyawad and Jakham (AS PAR G-SCHEDULE) DCFWL CHITTORGARH
Interlocking concrete block work in Division Office
Felling/harvesting of trees, stump removal, and transportation operations (including loading, weighing, and unloading) and stacking at the depot.