Loading
Loading…
Loading…
20 results • Recent activity
Providing and laying 2200 mm and 2000 mm dia RCC NP 3 Pipe Line From Existing Outlet Points of Storm Sewer of Urban Estate Phase 1 3 and 2 to Proposed Outlets Points and Construction of Manholes in Badi Nadi Area at Patiala
Providing Storm Water Drainage at Various Places, Construction of Desilting Chamber Drilling and Installation of Tubewell for Rain Water Harvesting and Rain Water Recharging Structure in Park No 39 Urban Estate Phase-1 and 2 at Patiala