Loading…
Loading…
2,191 results • Recent activity
Transformer oil Testing_MDPL_Mundra _MDPS _Station, Transformer oil Testing_MDPL_Bhachau_Station, Transformer oil Testing_MDPL_Santalpur _SIPS_Station, Transformer oil Testing_MDPL_Palanpur _PRPS_Station, Transformer oil Testing_MDPL_Pindwara_Station, Transformer oil Testing_MDPL_ Awa _AIPS_Station, Transformer oil Testing_MDPL_ Ajmer _ARPS_Station, Transformer oil Testing_MDPL_Jaipur _JRPS_Station, Transformer oil Testing_ BPPL _ Barmer _DT_Station, Transformer oil Testing_MDPL_Mundra _MDPS _Station and SVs, Transformer oil Testing_MDPL_Santalpur _SIPS_Station and SVs, Transformer oil Testing_MDPL_Palanpur _PRPS_Station and SVs, Transformer oil Testing_MDPL_Pindwara_Station and SVs, Transformer oil Testing_MDPL_ Awa _AIPS_Station and SVs, Transformer oil Testing_MDPL_ Ajmer _ARPS_Station and SVs, Transformer oil Testing_MDPL_Jaipur _JRPS_Station and SVs
PROC FOR VALVE SPARE FOR COMPRESSO WHA
4 inch PIPE STD, A106 GR B, 3 inch PIPE, IBR STD, A106 GR B, 2 inch PIPE XS, A106 GR B, 2 inch PIPE, IBR XS, A106 GR B, 2 inch PIPE GALV XS, A106 GR B, 1.5 inch PIPE, IBR XS, A106 GR B, 1.5 inch PIPE GALV XS, A106 GR B, 1.25 inch PIPE GALV XS, A106 GR B, 1 inch PIPE XS, A106 GR B, 1 inch PIPE, IBR XS, A106 GR B, 1 inch PIPE GALV XS, A106 GR B, 0.75 inch PIPE, IBR Sch 160, A106 GR B, 0.75 inch PIPE GALV Sch 160, A106 GR B, 0.5 inch PIPE Sch 160, A106 GR B, 0.5 inch PIPE, IBR Sch 160, A106 GR B
Hiring of Third-Party Inspection Agency - Oil and Gas; To be entered by buyer as per domain; Government Test Agency, PNGRB
ATG PROBE PHASE 6 7 8, ATG PROBE PHASE 12, ATG PROBE PHASE 13, RAM 4 GB DDR3 PHASE 6 7 8, Zener Safety barrier SBEM PHASE 6 7 8, 8 PORT SWITCH PHASE 6 7 8, 4 port USB commverter V6 PHASE 6 7 8, Wired Keyboard Service PHASE 6 7 8, Wired Mouse Service PHASE 6 7 8, CNWGT NWGT, COMPLETE FCC PHASE 6 7 8, MONITOR PHASE 6 7 8, MONITOR PHASE 12, TLS IB Console PHASE 6 7 8, ATG Barrier Card PHASE 6 7 8, SMPS PHASE 6 7 8, UPS 1 KVA PHASE 6 7 8
Supply of New Chassis frame, Electrical Rewiring and Air Pipe Replacement, Chassis Number Punching, Fire Tender Frame and Water tank Fixing, Chassis Painting, Chassis Welding and and Light Repair Works, transportation Charges