Loading…
Loading…
19,274 results • Recent activity
Additional work of laying of rising main at Surjanagar Head Work Site to High lift site and interconnection of collecting main to CWR in the river of Damodar under Augmentation of RCFA PartII PWSS under RCFA DivisionI.PHE Dte
Repair to 50000 GPH x 30 meter head pump motor set alongwith allied works at pumping station Salmay stage-0 (New).
Balnce work of distribution pipe line of Kanska ZoneII PartB from OHR to Pathanpara under Augmentation of Birudiha W/S Scheme under RCFA DivisionI PHE Dte
Repair to 120000 GPH x 48 meter head HC pump set alongwith allied works at pumping station Salmay stage-0 (Old).
Urgent repairing and restoration at Distribution Network within Dabor OHR and MS work at Lohat Kata More under RCFA Division-I PHE Dte.
Repair to 50000 GPH x 130 meter head pump motor set alongwith allied works at pumping station Salmay stage-1st (Old).