Loading…
Loading…
19,200 results • Recent activity
Deep Drilling of 125 mm dia Bore Holes by using ODEX method including providing, installation, testing, commissioning of Mark II Hand Pumps and construction of platforms at (02 Nos) different locations in District Kathua on Turnkey Basis (EPC) under
Day to day repair, Operation maintenance of distribution system, rising main and allied pipelines(CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts including repairing of FHTC connection and providing new FHTC connection for Suruppur PWSS
Annual Operation and maintenance of different dia distribution pipe line Ethora under RCFA Part-I Water Supply Scheme under RCFA Division-I PHE Dte. (w.e.f. 01.01.2025 to 31.12.2025)
Carriage of drinking water by mecanised van capacity 1 KL including loading unloading etc.
Balance work for dismantling of concrete, road restoration of road including pipe crossing by adopting trenchless technology (e.g) jack pushing method etc and allied work at Ramnagar under RCFA Division-I PHE Dte.
Creating separate zone with pipe line and additional FHTC including Water sources at Sibpur Ruidaspara under Augmentation of Krishnapur Water Supply Scheme under RCFA Division-I PHE Dte.