Loading…
Loading…
176 results • Recent activity
Club work 1- repairing/maintenance and fabrication of platform structure for weighbridge no. 01, 10 and BS-II Bachra Siding under CHP-CPP, PPR. 2-Dismantling, Fabrication, and Installation of Platform of Weighbridge No. 11 u
Providing, making and fixing Earth pit board with stand, Electric shock Safety Board for substation Weigh Bridge Wall Painting and writing W/B details, Indoor Flex pasting written with weighbridge details, 4211 Main substation Layout, and Making a
Complete repairing and re-conditioning of the Pump (2000 GPM, 100 mtr head, Make- Sykes, Sl NO/Tag No-3) installed at Dept. patch for mine water dewatering under Ashok OCP, PPR Area.
Laying 10 dia MS pipe 01 range length 3050 m patch A area from main sump to near IOCL Plant Nala under Ashok O C P PPR Area.
Providing and fixing of V-belt link belt Gland packing with provision of tyre coupling with pilot bore for smooth running of pumping operation under Ashok project PPR Area.
Bush cutting/branch trimming on as and when required basis 5 mtr both side of 33kv, 11kv, 3.3 kv HT Overhead lines, LT overhead lines of mines under Ashok OCP and outer premises of 10 MVA, 5 MVA Sub station and TSS installed in different location of