Loading…
Loading…
176 results • Recent activity
Laying of HDPE pipe and lay flat hose (490 mtr length) from main dewatering pie line of patch A towards coal stock 90 for prevention of spontaneous heating of coal and (2) Laying of ms pipe 150 mm dia length 790 mtr from departmental patch to OB d
Dismantling Diversion of 3.3 KV OH Line (FD 4) across upcoming Mahalaxmi Camp by dismantling (8 span) and erection of 12 span HT (3.3 kv ) OH line at BarwaTola under Ashok Exp OCP
Dismantling, repairing and back fitment of 02 nos rear suspension assy, seal replace-ment, bush fitment and pin fabrication, stair, mud flap guard, safety walk, stopper frame, engine-transmission guard, anchor, etc of BH60M dumper T70 at AOCP
Repairing of effluent treatment plant and drain at Ashok workshop under Ashok OCP, Piparwar Area including AMC for 02 years.
Repairing of platform structure of 04 No.s Road Weigh Bridges by cutting/welding etc as required under Ashok OCP.
Job.1 Cleaning testing and painting of the 6170.00 Nos. of 20Kg CI test Weights for stamping of Various road WB 14 16 (QTR JAN) and 5 7 8 (QTR APRIL) Under Ashok OCP,PPR Area. Job.02 Cleaning testing and painting of the 2500.00 Nos. each of 20Kg