Loading…
Loading…
178 results • Recent activity
Preparation of ground inside of Shiv mandir at New Bijain under Ashok OCP, Piparwar Area.
Repairing of battery box, support of carrier roller, grease plate, operator cabin gates, its mountings, fan pulley, both side 54nos. sprocket holes, tilt cylinder steel pipe and its guard, trunnion back guards, both side track frame of D355 Dozer D19
Day to day cleaning of weighbridge no.01 and 02, 10,11 in CHP CPP and BS 01, BS 02 in Bachra Siding for 02 years including cleaning, mopping of weigh bridges room and cleaning of drain near W.B. no.01 under CHP CPP , Piparwar Area.
Repairing of parking brake assy. of WA800 Pay Loader sl.no-L7 at Ashok OCP
Fabrication and fitment of 2 no end bit, 54 no bolts applicable for CAT D11T dozer D2 from end bits and cutting edge of Komatsu 475 Dozer and repairing of its mounting at AOCP.
Demounting of bucket assy from boom and bell crank, dismantling of damaged pins and bushes, Rebuilding, machining, line boring, drilling and thread making bucket 04no. eye, and 02nos. Eye of boom, etc WA800 Pay Loader PL7 at Ashok OCP.