Loading…
Loading…
6 results • Recent activity
Upgradation of Rural road from SH connection (Krishna Biswas Home) to Ramakrishnapur Dam at Hut Bay, South Andaman under PMGSY-III Batch-I 2024-25 (Package No.AN01HB21 length 4.425 km)
Upgradation of Rural road from SH connection (Krishna Biswas Home) to Ramakrishnapur Dam at Hut Bay, South Andaman under PMGSY-III Batch-I 2024-25 (Package No.AN01HB21 length 4.425 Km)
Upgradation of Rural road from SH connection (Break water village) to Farm Tikrey at Hut Bay South Andaman under PMGSY-III Batch-I 2024-25 (Package No.AN01HB20 length 3.640 km)
Upgradation of Rural road from SH connection (near Green Island) to Rabindranagar Ward No.6 at Hut Bay, South Andaman under PMGSY-III Batch I, 2024-25. (Package No.AN01HB22, length 2.700 Km)
Upgradation of Rural road from SH connection (near Shree Rama Temple) to SIPU and laxmi Priya bazar at Hut Bay, South Andaman under PMGSY-III Batch I, 2024-25. (Package No.AN01HB23, length 1.372 Km)
Upgradation of Rural road from Hanuman Junction to Onge Tikrey G Block Bus Stand at Hut Bay, South Andaman under PMGSY-III Batch I, 2024-25. (Package No.AN01HB24, length 1.999 Km