Loading…
Loading…
59 results • Recent activity
Transportation of material like Roof bolts with nuts and bearing plates, W- straps cap-sules, Props/planks and Stemming Material Etc. from surface to UG panel of L.W.S and Bagdona Seam all Running districts
Preparation of proper accommodation of travelling roadway by manually drain cutting and manually sweeping/cleaning of galleries in Bagdona seam.
Making, placing and erection of Heavy Stone Dust Barrier (excluding related mate-rials) in all LHD running panels of Bagdona seam
Heightening of drift 26D/25L, 26D/39L and removal of coal shale from 26D/25L drift in underground gallery (including transpor-tation) for preparation of proposed belt in-stallation in 26D/25L drift of LWS.
Construction of 04 nos. Retaining wall (fly ash bricks) for 21D Pump of MD dist, LWS.