Loading…
Loading…
177 results • Recent activity
Mtc. of submersible / mono block centrifugal pumping set 36 to 50 HP and 25 to 35 HP for tubewell / boosting station in Sector 1,2,4,5,5B and 6 MDC, Panchkula and sector 28 and 30 Pinjore and mtc of Horizontal pumping machinery 100 HP, 60HP and 5 HP
Mtc of 32 Nos. submersible / monoblock centrifugal pumping set 36 HP to 50 HP (25 to 35 HP(8No), 60 HP (2 Nos), 75 HP (2 Nos), 100 HP (1No), 150 HP Horizontal Pump (5 Nos) and 3 HP Vaccum Horizontal Pump (6 Nos) in Sector 23 to 28 and 31 Panchkula Ex
Construction of HL Bridge in Panchkula (Extn.). (Shifting of utility services i.e, SWD line, Manhole, road gullies and construction of road and Rising of Manhole and Existing Nallah/SWD Line complete in all respect and entire satisfaction of Engineer
Providing and laying of DI pipe line from Booth No.387 to 403 and booth no. 404 to 420 Sector 26, Panchkula complete in all respect as per satisfaction of EIC (A/mtc of PH services in sector 23 to 28, 31 and 32 Panchkula Extension)
Providing and fixing of missing kerb, crush barrier, painting, road marking etc 60 mtr dividing road in Sector 1 and 2 MDC Panchkula all other works contingent thereto (A/mtc of PH services in Sector 1,2,4,5,5B and 6 MDC, Panchkula)
Construction of manhole and PL of SW pipe line 200mm id in day to day mtc in sector 30 Pinjore (A/mtc of PH services in Sector 23 to 28, 31 and 32 and Sector 1 to 6, MDC, Panchkula)