Loading…
Loading…
11 results • Latest
Road Protection Work/Slope Stabilization Measures st Ch. 121.990 km-Ch. 122.090 km Berinag Askot Road SH-03
Road Protection Work/Slope Stability Measures st Ch. 12.200 km-Ch. 12.284 km along Lambidhar-Kimadi-Dehradun Road, SH-79, Uttarakhand
Road Protection/treatment works of slope from Ch. 19.967 km - Ch. 20.103 km along Jakholi-Guptkashi road, (SH-37
Road Protection/treatment works of slope from Ch. 12.000Km-Ch. 12.200Km along Narendranagar- Ranipokhari Road (SH-77)
Road Protection/treatment works of slope from Ch. 8.000Km-Ch. 8.220Km along Narendranagar-Ranipokhari Road (SH-77)
Construction of 93M Length Motor Bridge at Govindghat in District Chamoli
Construction of 120M length pedestrian bridge to connect Malana village with KM 06 of Arakot Chinwa Balcha motor road under Vikaskhand Mori in District Uttarkashi
Hiring of Supervision Support Consultant under U-PREPARE
Construction of 78M Span steel Motor bridge over Alaknanda River langsi dwing tapon Lanji Pokhni Motor Road
Construction of 60M Steel Motor Bridge in Almora Sainar Chan Motor Road
Hiring of Proof Checking Consultant for Bridge Design under U-PREPARE Project