Loading…
Loading…
1,281 results • Latest
Permanent Restoration of Km 17th JA Road to Nadwal road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-203, Block Bhalwal District Jammu
Construction and Maintenance of Road from L037-(Link Road) Kohag to Kudetar via Dallian Road RD 6.200 to Tumbu Package No. JK07-4521, PMGSY-IV, Batch-I of 2026-27, Block-Duggain, District Kathua (Using Waste Plastics Length 4.000 Kms) Length 4.000 Km
Construction and Maintenance of Road from L123-(Link Road) Gandala- Bali PWD road Km 2nd to Seri Package No. JK14-4018, PMGSY-IV, Batch-I of 2026-27, Block-Udhampur, District Udhampur. (Using Waste Plastics 3.412 Kms) Length 3.412 Kms
Construction and Maintenance of Road L043-(Link road)Rajpura Bedar Road km 1.60 to Qazian Package No. JK11-4054, PMGSY-IV, Batch-I of 2026-27, Block-Mandi, District Poonch Length 4.100 Kms
Hiring of Commercial vehicle One Number Mahindra Bolero Neo not before 01st January, 2026 or Equivalent without Driver and POL on Monthly Hire-basis for official use of Financial Controller PWD Civil Secretariat JK UT
Construction and Maintenance of Road L041-(Link Road)Rajpura PS road km 1.600 to Ziarat Arai Gali Package No. JK11-4053, PMGSY-IV, Batch-I of 2026-27, Block-Mandi, District Poonch Length 4.150 Kms
Construction and Maintenance of Road from L024-KM 3RD OF UCCHAD KASBLARI ROAD TO PHALLIAN Package No. JK11-4501, PMGSY-IV, Batch-I of 2026-27, Block-Mankote, District Poonch (Using Waste Plastics Length 4.000) Length 4.000 Kms
Construction and Maintenance of Road from L121-(Link Road) Pangara Jagir PMGSY road km 4th to Saroda Trimbli Led Package No. JK14-4016, PMGSY-IV, Batch-I of 2026-27, Block-Udhampur, District Udhampur. (Using Waste Plastics 6.400 Kms) Length 6.400 Kms
Providin and Erectin of W Metal Beam Cresh Barier, Cautionary Board, retro reflective Sign boards, Edge wall and Parapets on various roads (pls refer to the e-Nit for information of roads)
Restoration of roads under the jurisdiction of PMGSY Division Ramnagar by way of clearance of slip/snow likely to occur during FY 2026-27 on Package Nos JK14344 JK14528 JK14687 JK14680
Restoration of roads under the jurisdiction of PMGSY Division Ramnagar by way of clearance of slip/snow likely to occur during FY 2026-27 on Package Nos JK14722 JK143009 JK14322 JK14672 and JK14436
Restoration of roads under the jurisdiction of PMGSY Division Ramnagar by way of clearance of slip/snow likely to occur during FY 2026-27 on Package Nos JK143008 JK14527
Construction and Maintenance of Road L037-(Link Road) Gref Road to Layee Package No. JK17-4224, PMGSY-IV, Batch-I of 2026-27, Block-Paddar, District Kishtwar (Using Waste Plastics - 2.000) Length 2.000 Kms Adv. Cost excl. maintt but incl of GST
Construction and Maintenance of Road from L024-(Link Road) Malti To Galiote Road KM 17th to Kharthal Package No. JK14-4405, PMGSY-IV, Batch-I of 2026-27, Block-Panchari, District Udhampur. (Using Waste Plastics 7.800 Kms) Length 7.800 Kms
Construction and Maintenance of Road L097-KM 6TH NH1B Kandhote Indralla road to Zellu Package No. JK04-4542, PMGSY-IV, Batch-I of 2026-27, Block-Thathri, District Doda (Using Waste Plastics Length-5.600 Kms) Length 5.600 Kms
Construction and Maintenance of Road from L022-(Link Road) Machhedi Drabbar Road RD 27.050 to Dhar Package No. JK07-4523, PMGSY-IV, Batch-I of 2026-27, Block-Lohi Malhar, District Kathua (Using Waste Plastics Length 4.500 Kms) Length 4.500 Kms
Construction and Maintenance of Road from L104-(Link Road) Approach road to Himbra bridge(PWD Road) Km 2nd to Nambal Package No. JK14-4019, PMGSY-IV, Batch-I of 2026-27, Block-Udhampur, District Udhampur. (Using Waste Plastics 7.131 Kms) Length 7.131
Construction and Maintenance of Road from L142-(Link Road) Servad to Gunni Road KM 2nd to Udhan Package No. JK20-4103, PMGSY-IV, Batch-I of 2026-27, Block-Katra, District Reasi. (Using Waste Plastics 5.000 Kms) Length 5.000 Kms
Permanent Restoration of Nagrota to Dhamoni Jagir road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-196, Block Dansal, District Jammu Call 2nd
Permanent Restoration on Kundal Affani road by way of construction of R/wall in Km 1st RD(725).
Permanent Restoration of Garota to Pukhwari Gumpul road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-74, Block Bhalwal, District Jammu Call 2nd
Construction and Maintenance of road from L064-(Link Road) Jaganoo to Ser Chompal nallaha Km 3rd to Neeli (Using Waste Plastics), Package No. JK14-4074, PMGSY-IV (Batch-I, 2026-27), Block Jaganoo, District Udhampur, (Length - 2.317 km)
Permanent Restoration of road from T03-BLOCK BOUNDARY TO HATHAL Under SASCI Rajouri
Permanent Restoration of road from Prat A Prat B upto Km 4th of T03 Under SASCI Rajouri
Permanent Restoration of road from L021-T02 KM 3rd to Block Boundary (Stage-II) Under SASCI Rajouri
Permanent Restoration of road from L046 Brevi to Kote Kabu Under SASCI Rajouri
Construction and Maintenance of Road L122-(Link road) Karol kumate road km 1st RD 0.00 to Notan Package No. JK19-4295, PMGSY-IV, Batch-I of 2026-27, Block-Ramban, District Ramban (Using Waste Plastics Length 2.960 Kms) Length 2.960 Kms
Construction and Maintenance of Road from L071-(Link road) Neoch to Shibrass KM 9th PMGSY Road to Kund Nar Package No. JK20-4239, PMGSY-IV, Batch-I of 2026-27, Block-Gulab Garh, District Reasi. (Using Waste Plastics 6.000 Kms) Length-6.000 Kms
Construction and Maintenance of road from L023 (Link road) Garh road Km 1st to Manowa, Package No. JK07-4508, PMGSY-IV, Batch-I of 2026-27, Block Mandli, District Kathua. Using Waste Plastic, Length-2.250 Kms
Construction and Maintenance of road from L025 (Link Road) Sejal Garh road RD 1.500 to SC Saryara, Package No. JK07-4515, PMGSY-IV, Batch-I of 2026-27, Block Billawar, District kathua. Using Open Graded Premix Carpet (OGPC) Length-2.70 Kms
Construction of 46 Mtr Span Through Type Steel Truss girder Motorable Bridge at KM 4th RD 400- 450 on Bhaga to Lalesa Marel road under Package No. JK14-556, Regular PMGSY (Batch-I, 2017-18), Block Reasi, District Reasi
Permanent Restoration of road from L052- Rajouri To Gurdanbala Road Part II Pkg no JK12-196 Under SASKI Rajouri
Permanent Restoration of road from Kotedhara to Soker PkgNo. JK 12-326.
Construction and Maintenance of Road L033-(Link Road) from Hutt to Doun Dedra Package No. JK07-4014, PMGSY-IV, Batch-I of 2026-27, Block-Boond, District Kathua (Using Waste Plastics Length 4.100 Kms) Length 4.100 Kms
Restoration of roads under the jurisdiction of PMGSY Division Budhal on emergency basis (Motorable path only) by way of clearance of Snow, slips/crate work likely to be occurred during the financial year 2026-27 on 1.Upgradadion of road from MRL-
Permanent Restoration on road from Samroli to Upper Samroli Pkg No JK14 269
Construction and Maintenance of Road L086-Km 9th Kharangal Chounri road to Luddu Pain Package No. JK04-4562, PMGSY-IV, Batch-I of 2026-27, Block-Gandoh, District Doda (Using Waste Plastics Length-3.400 Kms) Length 3.400 Kms
Construction and Maintenance of Road from L030-(Link road) Link from Budhal Ramban Road to Loki Dandwat Package No. JK12-4569, PMGSY-IV, Batch-I of 2026-27, Block-Budhal New, District Rajouri. Length 3.500 Kms
Construction and Maintenance of road from L094-(Link Road) Ghordi Khas to Manlal km 9th to Jasani (Using Waste Plastics), Package No. JK14-4050, PMGSY-IV (Batch-I, 2026-27), Block Ghordi, District Udhampur, (Length - 2.682 km)
Construction and Maintenance of road from L054-(Link Road) Barta higher secondary school road km 1st to Chapper (Using Waste Plastics), Package No. JK14-4076, PMGSY-IV (Batch-I, 2026-27), Block Jaganoo, District Udhampur, (Length - 1.800 km)
Construction and Maintenance of road from L109-(Link Road) Dabreh to Chak km 4th to Jar (Using Waste Plastics), Package No. JK14-4017, PMGSY-IV (Batch-I, 2026-27), Block Udhampur, District Udhampur, (Length - 1.600 km)
Permanent Restoration of Kandani to Ohli Part-I road 2nd Call
As per NIT
resto. of work T_S_2026_2026
NAND_PR
KORKHANA_PR
l_KUNOO_PR
Resstr. of rd
Constt. Of road Jakhole to Raichengera JK07-256 under Permanent Restoration
Construction and Maintenance of road from L116 Km 4th of Balakote Behrote Road to Dullian Sandote, Package No. JK11-4519, PMGSY-IV, Batch-I of 2026-27, Block Balakote District Poonch. (Using Waste Plastics) Length 2.82 Kms