Loading…
Loading…
4,779 results • Latest
Construction of Blacktop Road from Chottoandulia Bus Stop H/O Asan Piyada under Alfa GP within Chapra Block
Construction and maintenance of road from L024 Khumriyal to Rang km 22 RD700 TO ZABDI Waste Plastics Length 2 10 Kms Stage Complete Carriageway width 3 75Mtrs PMGSY IV BatchI 2026 27 Package No JK084054 PMGSY Division Kupwara
Construction and maintenance of road from L030 Shartpora Sobiya KM4 RD500 to Khan check Waste Plastics Length 2.250 Kms Stage Complete Carriageway width 3.75Mtrs PMGSYIV Batch I 2026-27 Package No. JK08-4032 PMGSY Division Kupwara
Permanent Restoration of road from Kotedhara to Soker PkgNo. JK 12-326.
Work regarding Traffic Safety and traffic calming measure on PMGSY road (Vide Package No. (i)WB20997, (ii)WB20242, (iii)WB20693, (iv)WB2080, (v)WB201023, (vi)WB20185, within Gopiballavpur II Block in the District of Jhargram
Work regarding Traffic Safety and traffic calming measure on PMGSY road (Vide Package No. (i)WB2402, (ii)WB20999) within Gopiballavpur I Block in the District of Jhargram
Work regarding Traffic Safety and traffic calming measure on PMGSY road (Vide Package No. (i)WB20ADB25, (ii)WB20510, (iii)WBADB49, (iv)WB20ADB48, (v)WB20299, (vi)WB20300, within Sankrail Block in the District of Jhargram
Work regarding Traffic Safety and traffic calming measure on PMGSY road (Vide Package No. (i)WB20656, (ii)WB20657, (iii)WB20247, (iv)WB20229, (v)WB201003, (vi)WB20654 within Nayagram Block in the District of Jhargram
Work regarding Traffic Safety and traffic calming measure on PMGSY road (Vide Package No. (i)WB20823 (ii)WB20830, (iii)WB20825, (iv)WB2406, (v)WB20827) within Jhargram Block in the District of Jhargram
Work regarding Traffic Safety and traffic calming measure on PMGSY road (Vide Package No. (i)WB20838, (ii)WB201117, (iii)WB2405,(iv)WB20340 within Jamboni Block in the District of Jhargram
Work regarding Traffic Safety and traffic calming measure on PMGSY road (Vide Package No. (i)WB20880, (ii)WB20212 (iii)WB20885, (iv)WB20884, (v)WB20879, (vi)WB201033, (vii)WB201037, (viii)WB20888, (ix)WB20891, (x)WB20ADB56 within Binpur-II Block in
Work regarding Traffic Safety and traffic calming measure on PMGSY road (Vide Package No. (i)WB2403(Both End), (ii)WB201113, (iii)WB201032, (iv)WB201030, (v)WB20313 within Binpur-I Block in the District of Jhargram
Carrying out Road Safety Audit of existing 62 nos PMGSY Road Total Length 454.167 Km within 12 nos Blocks under Barasat Division in the District of North 24 Parganas
Post DLP Maintenance works E-Marg Module of PMGSY Road namelyManigram to Sabaipur Road Package No. WB01MTN051
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC 67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 m
UT07439-2 Construction of L099-Shyamkhet to Koon MR Stage-I and II
UT07438-2 Construction of L075-Chheerakhan to Talli Pokhari MR Stage-I and II
PMGSY-IV, BATCH-1, 2026-27 Construction Of Various Road in Kaprada Taluka Dist. Valsad. Pakage GJ25P11(Total 5 Roads, 2.82 Km) Tal. Kaprada. Dist. Valsad
PMGSY-IV, BATCH-1, 2026-27 Construction Of Various Road in Kaprada Taluka Dist. Valsad. Pakage GJ25P12(Total 5 Roads, 5.97 Km) Tal. Kaprada. Dist. Valsad
PMGSY-IV, BATCH-1, 2026-27 Construction Of Various Road in Kaprada Taluka Dist. Valsad. Pakage GJ25P7(Total 4 Roads, 2.72 Km)
PMGSY-IV, BATCH-1, 2026-27 Construction Of Various Road in Kaprada Taluka Dist. Valsad. Pakage GJ25P8(Total 4 Roads, 2.48 Km)
PMGSY-IV, BATCH-1, 2026-27 Construction Of Various Road in Kaprada Taluka Dist. Valsad. Pakage GJ25P9(Total 4 Roads, 2.76 Km) 510 Tal. Kaprada. Dist. Valsad
PMGSY-IV, BATCH-1, 2026-27 Construction Of Various Road in Kaprada Taluka Dist. Valsad. Pakage GJ25P10(Total 4 Roads, 2.95 Km) Tal. Kaprada. Dist. Valsad
PMGSY-IV, BATCH-1, 2026-27 Construction Of Various Road in Kaprada Taluka Dist. Valsad. Package GJ25P5(Total 4 Roads, 2.448 Km)
PMGSY-IV, BATCH-1, 2026-27 Construction Of Various Road in Kaprada Taluka Dist. VALSAD. Package GJ25P6(Total 5 Roads, 3.52 Km)
PMGSY-IV, BATCH-1, 2026-27 Construction Of Various Road in Kaprada Taluka Dist. Valsad. Package GJ25P4(Total 5 Roads, 4.917 Km)
PMGSY-IV, BATCH-1, 2026-27 Construction Of Various Road in Kaprada Taluka Dist. Valsad. Package GJ25P1(Total 4 Roads, 2.766 Km)
PMGSY-IV, BATCH-1, 2026-27 Construction Of Various Road in Kaprada Taluka Dist. Valsad. Package GJ25P2(Total 5 Roads, 2.993 Km)
PMGSY-IV, BATCH-1, 2026-27 Construction Of Various Road in Kaprada Taluka Dist. Valsad. Package GJ25P3(Total 4 Roads, 2.077 Km)
Construction and Maintenance of Road L033-(Link Road) from Hutt to Doun Dedra Package No. JK07-4014, PMGSY-IV, Batch-I of 2026-27, Block-Boond, District Kathua (Using Waste Plastics Length 4.100 Kms) Length 4.100 Kms
Restoration of roads under the jurisdiction of PMGSY Division Budhal on emergency basis (Motorable path only) by way of clearance of Snow, slips/crate work likely to be occurred during the financial year 2026-27 on 1.Upgradadion of road from MRL-
Preparation of DPR of roads for different Blocks under RIDF XXXII and CAPEX in the jurisdiction of WBSRDA HooghlyDivision
Permanent Restoration of L046-Langate to Manabal road
Permanent Restoration on road from Samroli to Upper Samroli Pkg No JK14 269
Srikati to Rarhati within KESHPUR Block in Paschim Medinipur District Length 1.495Km
Construction and Maintenance of Road L086-Km 9th Kharangal Chounri road to Luddu Pain Package No. JK04-4562, PMGSY-IV, Batch-I of 2026-27, Block-Gandoh, District Doda (Using Waste Plastics Length-3.400 Kms) Length 3.400 Kms
Construction and Maintenance of Road from L030-(Link road) Link from Budhal Ramban Road to Loki Dandwat Package No. JK12-4569, PMGSY-IV, Batch-I of 2026-27, Block-Budhal New, District Rajouri. Length 3.500 Kms
Construction and Maintenance of road from L094-(Link Road) Ghordi Khas to Manlal km 9th to Jasani (Using Waste Plastics), Package No. JK14-4050, PMGSY-IV (Batch-I, 2026-27), Block Ghordi, District Udhampur, (Length - 2.682 km)
Construction and Maintenance of road from L054-(Link Road) Barta higher secondary school road km 1st to Chapper (Using Waste Plastics), Package No. JK14-4076, PMGSY-IV (Batch-I, 2026-27), Block Jaganoo, District Udhampur, (Length - 1.800 km)
Construction and Maintenance of road from L109-(Link Road) Dabreh to Chak km 4th to Jar (Using Waste Plastics), Package No. JK14-4017, PMGSY-IV (Batch-I, 2026-27), Block Udhampur, District Udhampur, (Length - 1.600 km)
Permanent Restoration of Kandani to Ohli Part-I road 2nd Call
As per NIT
resto. of work T_S_2026_2026
NAND_PR
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
KORKHANA_PR
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
Construction / Upgradation of Road/ CD works including maintenance for Five year after construction-District Mining Fund (DMF).
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 10 Year
l_KUNOO_PR