Loading…
Loading…
5,575 results • Recent activity
Construction of the road from Tripti Hotel to Saluka Village via Saharjora Ghosh Para within Barjora Block. Length 4.400 km
Construction and Installation of Faecal Sludge and Treatment Plant of 20 KLD capacity based on Enhanced Digestion and Multi-stage Bioreactor (EDMSB) technology at Labpur Block, Birbhum District
Construction and Installation of Faecal Sludge and Treatment Plant of 3 KLD capacity based on Bio Digester Aided Constructed Wetland (BAC) technology at Katwa-I Block, Purba Bardhaman
Construction and Installation of Faecal Sludge and Treatment Plant of 3 KLD capacity based on Bio Digester Aided Constructed Wetland (BAC) technology at Patrasayar Block, Bankura District
Construction of CC road from Parasidanga to Raghunathpur Malpara within Indpur Block in the District of Bankura (Length 2.50 km)
Baliguni to Penga with in Nanoor Block (Road Length 5.600 km) Post 5 Years Package Number WB 04MTN066